Sand production simulation experimental device


Published Time:

2025-04-22


Artificial sand is configured based on the distribution data of formation core (PSD). The artificial sand is vertically loaded on the core machine according to the cementation strength of the formation rock to form an artificial core. The artificial core is placed in the experimental evaluation device to simulate the formation core layer, gravel layer, and casing wall of the oil and gas well, and the experimental oil is displaced outside the "artificial wellbore".
Achieve the detection of anti-clogging, reverse circulation washing acid washing, and sand production of various combinations such as perforation, bare hole, sand screen prevention, and gravel filling prevention of screen pipes with different sand prevention media under the condition of liquid production speed;
Evaluate the sand prevention effect and process of full-size screen pipes;
Optimize different sand prevention screen pipes.

Technical Parameters

Working Pressure ≤30MPa
Pressure Measurement Accuracy ±0.1%F.S
Working Temperature Range Room temperature +15℃~120℃
Temperature Measurement Accuracy ±0.2℃
Flow Meter Range—Accuracy 0~500ml/min—0.5%
Variable Casing Size 4÷~98 standard casing
Variable Screen Pipe Size 2g~7 standard casing
Simulated Well Inclination Angle Range 0~90°
Reactor Size φ640mm (inner diameter) × 500mm
Pressure Sensor Range—Accuracy 30MPa—0.1%
Electronic Balance Range and Accuracy 1100g/1mg
High-pressure Plunger Pump Flow Range 12.5m³/h

Free Quote

Please leave the correct contact information, we will get in touch with you as soon as possible